Lease your property for a large battery storage system
Stable, long-term lease income, without investment costs, without risk and without restrictions on your remaining areas. We take care of everything: from planning to construction to operation.

Benefits for Landowners
Long-term lease income
You will receive a fixed annual rent payment over the entire project duration of up to 30 years, regardless of harvest yields, market prices, or weather conditions. The income is contractually secured and inflation-protected.
Minimal Space Requirements
Battery storage requires about 2,000 – 30,000 m², depending on the size. Usually, this is a fraction of what solar or wind power plants need.
No cost to you
All costs for planning, approval, construction, and operation are borne by enerpeak or its partners. You merely provide the space and have no financial risk.
Contribution to the energy transition
By leasing your property, you enable the construction of critical energy infrastructure. Battery storage stabilizes the power grid and accelerates the integration of renewable energies, making a tangible contribution to your region and to Germany.
How it works:
1.
Contact us
You contact us or we contact you. In an initial conversation, we clarify whether your property is basically eligible.
2.
Location verification
We check your property for technical suitability: distance to the nearest network infrastructure, area size, access roads, and planning law requirements.
3.
Lease offer
Upon positive review, you will receive a binding lease offer with transparent terms: the duration, lease amount, and your rights as the owner are clearly defined.
4.
We’ll take care of the rest
After the contract is signed, we take care of everything else: approval processes, grid connection, construction, and long-term operation. You receive your lease payments, and we handle the work.
Is your property Suitable?
Not every plot of land is suitable for a battery storage system. The key criteria at a glance:

Proximity to grid infrastructure
The property should be located near a transformer station or a high-voltage line (110 kV or higher). The shorter the distance to the connection point to the grid, the more economically viable the project.

Land type & location
Agricultural land, commercial areas, industrial wastelands, or other undeveloped plots are suitable. The area should be as level as possible, located 200-300 meters away from residential buildings, and lie outside of nature or water protection zones as well as areas at risk of flooding.

Minimum area
We need a contiguous area of at least approximately 2,000 m² (about 0.2 ha). Larger areas allow for more powerful storage and higher rental income.

Accessibility and access route
For construction and subsequent maintenance, access for trucks and heavy transports is required. Existing field or agricultural roads are usually sufficient and will be reinforced by us accordingly.
Are you unsure if your property fits? Contact us and we will check it for you for free and without obligation.
Frequently asked questions
Modern battery storage systems feature multi-level safety concepts: early fire detection, automatic extinguishing systems, continuous temperature monitoring, and physical protective devices. The fire protection concept is developed in close coordination with the local fire department. All systems are certified according to international safety standards.
At the end of the contract term, the battery storage system will be completely dismantled at the expense of enerpeak. The property will be restored to its original condition. This dismantling obligation is contractually secured and backed by guarantees.
Yes. Only the actually required portion of the area will be leased. The remaining area will remain fully in your possession and use.
The rent amount depends on various factors: location, area size, proximity to the network connection, type of land, and position. You will receive a personalized offer with transparent conditions. Lease payments are usually significantly higher than those of agricultural leasing.
No. enerpeak takes care of the entire approval process—from coordination with the municipality, through the development planning procedure, to the building permit. We keep you updated on the progress, but the work is our responsibility.
From initial contact to commissioning, the process usually takes up to four years. The greatest time factors are the approval process and the date when we are allowed to connect the storage system to the power grid.
Your property could be the right location
Contact us for a free, no-obligation initial assessment. We will check whether your property is suitable for a battery storage system and, if positively evaluated, provide you with a personalized lease offer.
info@enerpeak.de
enerpeak GmbH
Oberanger 38
80331 München
Deutschland